Project Spotlights
Inside the Margalla Hills Glamping Capsule Project
By ABY Group Editorial Team · 10 June 2026 · 7 min read
Margalla Hills glamping project — case study cover
When a boutique hospitality operator approached ABY about a hillside glamping site in the Margalla Hills, the brief was clear: hotel-grade finishes, a fast build timeline, and minimal disturbance to the natural slope.
Factory-built capsule homes solved the timeline and site-disturbance problem at once — each unit was finished in our Lahore factory, then craned into position on pad foundations rather than requiring extensive cut-and-fill earthworks.
Two panoramic glass cabins were added for premium suites, engineered with insulated glazing for the site's cooler hillside climate.
The whole cluster now runs on a shared ABY Solar Energy microgrid, keeping the site's operating costs low and its footprint light — a good example of how our engineering and solar divisions work as one team on a single project.