
Category C
Infrastructure & Utilities
Pedestrian and steel bridges, telecom towers and lighting infrastructure for public and private clients.
Request a Free QuotePEC-Registered Engineers
Licensed structural & electrical engineers
Written Warranty
Workmanship warranty on every project
ISO-Aligned QA Process
Stage-by-stage inspection & testing
Nationwide Delivery
Own fleet — 15+ cities served
From pedestrian crossings to telecom towers, ABY Engineering delivers structural steel infrastructure for government, telecom and private-sector clients, with in-house design, fabrication and certified erection crews.
Every structure is engineered to relevant Pakistani and international structural codes, with full calculation packages available for client and authority review.
Full Range
Infrastructure & Utilities — Services & Products
High mast lighting tower — night installation
High Mast & Street Lighting
High-mast lighting towers and street-lighting poles for highways, stadiums and industrial yards.
- Type
- High mast / street lighting pole
- Built-up Area
- Per pole
- Est. Price
- PKR 180,000–1.8M per mast
Steel pedestrian bridge — completed ABY project
Pedestrian Bridges
Steel truss and girder pedestrian bridges for canals, roads and campus crossings.
- Type
- Truss/girder pedestrian bridge
- Built-up Area
- Per span
- Est. Price
- Quoted per span/loading

Steel Bridges
Vehicular and access steel bridges engineered for road, farm and site-access crossings.
- Type
- Vehicular access bridge
- Built-up Area
- Per span
- Est. Price
- Quoted per span/loading
Telecom tower — lattice steel structure
Telecom Towers & High Masts
Self-support and guyed telecom towers engineered to wind-loading and antenna-loading specifications.
- Type
- Self-support / guyed lattice tower
- Built-up Area
- Per site
- Est. Price
- Quoted per height/loading schedule
Get Started
Request a Quote — Infrastructure & Utilities
Tell us about your project and our engineering team will follow up with a fixed-price quote.
“ABY delivered our warehouse frame two weeks ahead of schedule, with zero rework needed on the racking floor. Their factory-controlled fabrication really shows on site.”
