
Engineering · Islamabad
GT Road Industrial Warehouse Complex
A 4,200 sq m high-bay distribution warehouse with racking-ready flooring, delivered in 11 weeks.
- Category
- Engineering
- Location
- Islamabad
- Client
- Private logistics group
- Year Delivered
- 2025
ABY Engineering delivered a full pre-engineered steel warehouse for a logistics client on GT Road, Islamabad, from foundation design through final handover in eleven weeks.
The 9-metre eave height and racking-ready floor slab now support a three-tier storage system, with dock-leveller bays keeping truck turnaround times short.
Project Gallery
Warehouse interior — racking aisles
Warehouse exterior — loading dock
Warehouse frame — under construction
Need Something Similar?
Services behind this engineering build:
