Rawalpindi Canal Pedestrian Bridge
A 28-metre steel truss pedestrian bridge, factory-fabricated and erected in under a week on site.
- Category
- Engineering
- Location
- Rawalpindi
- Client
- Municipal contractor
- Year Delivered
- 2024
This canal crossing needed minimal closure time, so ABY fabricated the full 28-metre truss span in our Lahore factory and craned it into place as a single unit.
Non-slip decking and code-compliant handrails were fitted before delivery, keeping on-site works to under a week.